background image

– 4 –

– 5 –

and pull tight. Repeat until all cords are 

attached to the apron bar. Attach the other 

apron bar to its beam in the same way.

INSTALLING THE HEDDLES IN THE 

SHAFT FRAMES

If your loom has a high castle, first remove 

the accessory tray (see page 6, Removing 

Shafts on High Castle Looms). Remove 

the nut from the jack pin at the bottom of 

each shaft (Figure 4) and pull the shaft 

from the loom castle by lifting it straight 

up. Lay the shaft frame flat on a table. 
Release the heddle bars from the heddle 

bar hooks that hold them in the shaft. 

Bend the heddle bars just enough to 

remove one end from the slot in the the 

shaft frame. Pull the other end out of the 

opposite slot in the shaft frame. 
Carefully slide the number of heddles 

that you need onto the heddle bars. This 

is best done by holding a small group 

of heddles firmly together, sliding one 

end of the heddle group onto the upper 

heddle bar, then sliding the other end of 

the heddle group onto the lower heddle 

bar. Do not let the heddles slip out of 

place while transferring them. Replace the 

heddle bars in the shaft frame by bending 

the bars slightly. Secure the heddle 

bars in the heddle bar hooks (Figure 5). 

Replace the shaft in the castle, insert the 

jack pin into the hole in the bottom of 

the shaft frame, and fasten with the nut 

(Figure 4). Repeat for each shaft. Be sure 

to keep the heddles oriented in the same 

direction for easier threading.

FIGURE 5: INSTALLING HEDDLES

shaft frame

heddle

bars

heddles

heddle bar hook

heddle bar hook

Note: 45" floor looms have two heddle 

bar hooks on each heddle bar.

FIGURE 4: REMOVING AND ATTACHING 

SHAFT FRAMES

nut

jack pin

jacks

shaft bottom

Summary of Contents for FL3109

Page 1: ...htspindle com Schacht Spindle Company 6101 Ben Place Boulder CO 80301 p 303 442 3212 f 303 447 9273 2020 Schacht Spindle Company Inc 01 20 FL3109 FL3111 FL3113 FL3115 FL3121 FL3123 FL3125 FL3127 FL331...

Page 2: ...ry packs 1000X heddles 1X warp beam crank handle 1X 1 2 cap nut 1X 1 2 USS washer apron cords 14X 33 cords for 36 maple loom 18X 33 cords for 45 maple loom 2X 360 cords for 36 cherry loom 2X 480 cords...

Page 3: ...re it in the same way Your loom is now in weaving position ATTACHING THE WARP BEAM CRANK HANDLE The warp beam crank handle attaches to a threaded rod on the right back leg of the loom Figure 1 Locate...

Page 4: ...pedal to your preferred angle THE BRAKE RELEASE HOLD The brake release hold is used to keep the brake release pedal depressed when you are winding on the warp Figure 7 page 7 Push the brake release p...

Page 5: ...heddles that you need onto the heddle bars This is best done by holding a small group of heddles firmly together sliding one end of the heddle group onto the upper heddle bar then sliding the other e...

Page 6: ...HIGH CASTLE LOOMS To remove the shafts from the castle you must first remove the accessory tray from the top of the castle It is attached by two bolts accessible from inside the tray at either side of...

Page 7: ...he top of the castle for the swivel pin of a lamp Figure 7 FIGURE 7 RIGHT FRONT OF LOOM brake release pedal beater support brake release hold beater side castle side ratchet advance lever ratchet dog...

Page 8: ...S FOR SCHACHT FLOOR LOOMS Double Back Beam in maple or cherry Tension Box for sectional warping Sectional Warp Beam in maple or cherry Loom Bench with Bench Bags in maple or cherry Spool Rack for sect...

Reviews:

Related manuals for FL3109