18
6. 4pcs ST4*8 big flat screws will be used to connect the inside chimney into the
hanging board, then put on the outside chimney, a hook will be used to put up the
outside chimney in order to the next installation, see pic 4.
7. 4pcs ST4*8 big flat screws will be used to install the outlet, see pic 5.
8. Adjust the 4 glass screws to check whether the glass and the cooker hood body
connected well and fixed, see pic 5.
9. Hold up the hood, 16pcs M4*10 big flat screws will be used to connect the hood
body into angle iron, see pic 6.
10. Put the expansion pipe on the outlet; after ensure all the things ok, put down the
hook, take from the outside chimney, all the installation is finished, see pic7&8.