
4
3.2.
Projection kit assembly (4" projection
shown)
-
Secure the side projection
(G)
to the top
projection
(H)
by the means of two bolts
(K)
and two nuts
(L)
. Repeat this procedure for
the assembly on the other side
(J)
.
3.3.
Projection kit installation
-
Align the holes inside the projection kit
assembly with the corresponding holes on
the faceplate backing plate and fasten with 6
screws
(B)
.
Step 4 : Cast iron faceplate installation
Finalize the positioning of the wood insert so
that the faceplate backing plate leans
against the fireplace’s front finish. Then
refer to the manual supplied with your
heater to install the cast iron components
(M)
using screws
(N)
pre-installed on the
front of the firebox of the insert.