Installing the Fence Rails
1.
Locate the front rail, the rear rail, and the T-Glide rails hardware pack (see
Fig. 1). All of the hardware needed to install the rails is located on the T-Glide
rails hardware pack and is shipped in the T-Glide fence box. In order to
easily identify the hardware used in each of the following steps, the different
pieces of hardware are numbered on the hardware pack and in the figures. If
you are missing the T-Glide rails hardware pack, the T-Glide table hardware
pack, or any of the other fence system components shown on page 1, call
the SawStop Service Department at 503-582-9934.
You will also need the following tools to complete the fence assembly:
• a 13 mm wrench
• two 17 mm wrenches (or adjustable wrenches)
• a 5 mm hex key
• a Phillips head screwdriver
• a level or straight-edge
Fig. 1
2.
Align the front rail (the larger of the two rails) with the front edge of the table top so the cut-outs at the top
of the rail are centered on the miter gauge slots in the table and so the holes in the rail align with the holes
along the front edge of the table and extension wings. Remove six M8 x 25 countersunk socket head bolts
from the T-Glide rails hardware pack and insert one through each of the holes in the rail and into the table
and extension wings
(see Fig.
2).
1
0
15
30
SawStop
10” Contract
or Saw
Fig. 2
front rail
Note:
Your contractor saw must be fully assembled before installing the fence system.
Note:
These drawings below show how to assemble both the 52” and 36” fence systems, although the
components shown are from the 52” fence system. The components from the 36” system are similar.
2 SawStop T-Glide Fence System - Professional Series
Installing Your T-Glide Fence System
T-Glide Rails Hardware Pack
1
Countersunk Socket Head Bolts,
M8 x 25 (8)
Lock Washers,
M8 (8)
3
Hex Nuts,
M8 (8)
4
Hex Head Screws with Attached
Washers, M8 x 16 (9)
6
Washers,
M8.5 x 23 (8)
2
Countersunk Socket
Head Screws, M8 x 16 (4)
5