Sawn
Craft
Cherokee
24
Manual
10/17/16
2.8 Upper Vertical Fuselage Installation
•
Parts
Required:
o
Main
Assembly
o
Upper
Vertical
Fuselage
Assembly
o
Firewall
&
Spacer
Assembly
5)
Glue
the
upper
vertical
fuselage
component
in
place
and
hold
in
position
with
T
‐
pins
until
the
glue
dries.
Apply
a
bead
of
glue
to
the
rudder
hinge
below
the
elevator.
Wipe
off
excess
glue
to
save
weight.
14
6)
Glue
the
firewall
and
spacer
assembly
to
the
front
of
the
airframe,
making
sure
that
you
use
sufficient
glue
to
create
a
strong
bond
as
this
is
a
high
stress
area.
Try
to
keep
glue
out
of
the
hole
in
the
assembly
as
the
motor
shaft
will
need
to
spin
in
this
area.