Operation
14
BA_EQJW126F001_EN001
3. Select – –.– – [
].
4.
Confirm selection ].
The public holiday is deleted.
Note:
Public holidays that are not assigned to a specific date should be deleted
by the end of the year so that they are not carried on into the following year.
1.8.2
Setting vacation periods
During vacation periods, the controller constantly remains in reduced operation.
A maximum of 10 vacation periods can be entered.
Parameter
WE
Level / Range of values
Vacation
period
(START,
STOP)
–
Extended information level / 01.01 to 31.12
Proceed as follows:
1.
In the extended information level (normal
switch position ) select data point for
vacation peri- ods [
].
Display:
2.
Open data point for vacation periods
]. Display:
START
3.
If applicable, select
– – – –
[
].
Summary of Contents for equitherm EQJW126F001
Page 5: ...Contents BA_EQJW126F001_EN001 5 12 5 Customer data 80 ...
Page 9: ...BA_EQJW126F001_EN001 9 Operation Fig 1 Icons ...
Page 27: ...BA_EQJW126F001_EN001 25 Functionsoftheheatingcircuit 24 BA_EQJW126F001_EN001 ...
Page 28: ......
Page 34: ...26 BA_EQJW126F001_EN001 Functionsof theheatingcircuit limits the value ...
Page 38: ...Functionsof theheatingcircuit 32 BA_EQJW126F001_EN001 ...
Page 45: ...Functionsoftheheatingcircuit BA_EQJW126F001_EN001 39 ...
Page 49: ......
Page 57: ...BA_EQJW126F001_EN001 47 Operationalfaults 46 BA_EQJW126F001_EN001 ...
Page 58: ......
Page 60: ...Operationalfaults 48 BA_EQJW126F001_EN001 available ...
Page 63: ......
Page 68: ...54 BA_EQJW126F001_EN001 Electrical connection block CO6 F04 1 is activated ...
Page 74: ...Electrical connection 56 BA_EQJW126F001_EN001 ...
Page 79: ...Installation BA_EQJW126F001_EN001 61 60 BA_EQJW126F001_EN001 ...
Page 80: ......
Page 92: ......