
1.
2.
3.
4.
5.
6.
7.
8.
The distributor on the return water distributor side should be placed lower than
the heating inlet.
Connection should be made by installing a safety valve with 3.5kgf/
偌
or lower
opening the discharge piping to the cistern tank.
The maximum operation pressure is 3.5kgf/
偌
. Do not supply water at a higher
pressure or directly connect the water pipe having the pressure higher than.
Overflow of water during the heating to the cistern tank means short tank
capacity. Exchange it with a larger one.
Backflow of water during the running or stopping of the circulation pump to the
cistern tank is caused by too much air in the pipe. Remove air by opening valves
on the distributor one at a time, while running the circulation pump.
Evaporation at the cistern tank means failure in the system. Contact your
representative to receive the check.
Never install any valve between the boiler and the cistern tank.
We will not be liable for any defect or breakdown caused by the failure to
comply with the above precautions.
Sealed cistern tank
Precautions
Safety Valve
Air exhaust Valve
Filter
Reducing Valve
Check Valve
Circulation Pump
Distributor
Condensate
Outlet
Drain
Drain
F.L
Sealed Expansion Tank
Install the condensate outlet hose for condensing model as above
Install the pipe as above when circulation pump
install heating water inlet
Bypass pipe
Circulation Pump
Filter
Reducing Valve
Check Valve
Water
Hot Water Inlet
Hot Water Outlet
Heating Water Outlet
Cold Water
Hot Water
Heating Coil
Fan Coil
Radiator
Boiler Back
26
Summary of Contents for Navien LFA-13K
Page 1: ......
Page 2: ......
Page 34: ...MODEL NO LST 17 21 24 30 41K LFA 17 21 24 30 41K Electric wiring diagram 34 0 3...
Page 39: ...memo 39...
Page 40: ...40 memo...
Page 41: ...memo 41...
Page 42: ...42 memo...
Page 43: ......
Page 44: ......