![Satcom 85405 Instruction Manual Download Page 2](http://html.mh-extra.com/html/satcom/85405/85405_instruction-manual_1200334002.webp)
SatelliteDish.com (954) 941-8883
Page 2 of 7
Typical Installation
Instruction Manual for the Prodelin GD 3.7 meter
240 Volt Half Coverage with Two C Band Heater System
Materials Provided List
Quantity Part Number Description
16
85405
Heater pad for 3.7 meter half coverage 240 volt
5
85406
Heater pad for 3.7 meter half coverage 240 volt
4
85407
Heater pad for 3.7 meter half coverage 240 volt
4
85408
Heater pad for 3.7 meter half coverage 240 volt
3
85409
Heater pad for 3.7 meter half coverage 240 volt
1
85404
Controller for 3.7 meter half coverage 240 V with mounting
brackets and two feedhorn heaters attached
32
Grommets
1
¼
-20x1” SS hex bolt with lockwasher and nut
2
Foil strips for lead wire attachment
1
Instruction manual for 3.7 meter 240 volt half coverage with
two feedhorns
Tools and Supplies Needed
Self tapping screws or U-bolt for sensor mounting
Drill
7/16” drill bit
7/8” drill bit
Adjustable wrench
Clean rags
Windex glass cleaner
Cable ties for cable anchoring
Read these instructions carefully and follow all of the procedures for installing this system. All
electrical wiring must be performed in accordance with all applicable electrical codes.