
Sase Company
4
2.
Installation
1.
Cut and remove the strings securing the plastic tube in place
(see figure 2)
.
2.
Insert the folded plastic tube onto the elongated bag holder
(see figure 2)
.
3.
Install the elongated bag on the machine by placing it over the two supporting balls.
4.
Push the supporting balls inward with your thumbs while lifting the holder with your
hands.
(see figures 3, 4 and 6).
Figure 6 Step-by-step demonstration of the elongated bag installation
5.
Make sure that the supporting balls are in position. They should be resting in the
groove
(see figure 7).
Figure 7 The supporting ball in position on the holder (view from below)