12
Startup
Mounting the Analytical Draft Shield Chamber
on the BA 210 S, BA 160 P, BA 110 S and BA 61
-
Remove plastic, adhesive Strips and foam packaging
-
When you handle the draft shield chamber, make sure it is always
in an upright position
Mounting the Draft Shield
-
Place the draft shield on the balance
-
Take the base plate out of the weighing chamber
-
Align the draft shield
-
Position the locking ring
(7)
in the weighing chamber and turn it
clockwise until it locks in place
Installing the Weighing Chamber Base Plate (6)
-
Position the base plate
-
The rear edge of the base plate has a sealing strip
-
Align the base plate with the sealing strip against the rear panel of
the draft shield and then lower the front part of the base plate and
press it down into place.
Summary of Contents for BA 110
Page 2: ...2 BA 210 S BA 160 P BA 110 S...
Page 3: ...3 BA 310 S BA 310 P...
Page 4: ...4 BA 110...
Page 5: ...5 BA 210...
Page 6: ...6 BA 4100 S BA 3100 P BA 2100 S BA 610 BA 6100 BA 4100 BA 2100...
Page 39: ...39 Dimensions Scale Drawings Note All dimensions are given in millimeters...
Page 40: ...40 Dimensions Scale Drawings Note All dimensions are given in millimeters...
Page 41: ...41 Dimensions Scale Drawings Note All dimensions are given in millimeters...