background image

3

Thanks for buying our Electric Bike Pump!

You’re now the proud owner of the Saris Infrastructure Electric Bike Pump, a modular ramp system designed for users 
to easily transport their bikes up and down stairs.

The Electric Bike Pump is made in the USA, and features an aluminum ramp channel. The stock length of channel is 8 
feet. The channel is easily cut to length. For installations up to 16 linear feet, two sections of the channel are used. The 
second channel is cut to size and attached to an uncut 8’ section of ramp using the joining biscuit assembly.

High strength aluminum end cap modules are provided with the system. They bolt on to the ends of the ramp and pro-
vide a smooth transition on and off the Electric Bike Pump.

The Electric Bike Pump is attached to the stairs using a mounting bracket system. The mounting brackets pivot, allow-
ing a wide range of stair pitches to be accommodated. Brackets are bolted onto the stairs.  Concrete anchors are pro-
vided with the system. If mounting to materials other than concrete, use an appropriate fastener for the base material.  
Brackets are sized to accept ¼” fasteners.

Please read and understand these instructions before beginning installation.

Everyone here at Saris Infrastructure want you to be happy with this product. Please contact us ([email protected], 608-
729-6243) should you need anything. 
 
Now, let’s get started.

Summary of Contents for ELECTRIC BIKE PUMP

Page 1: ...ELECTRIC BIKE PUMP OPERATION MAINTENANCE MANUAL Customer Service 800 783 7257 sarisinfrastructure com...

Page 2: ...Register your product for updates sarisinfrastructure com registration Tell Us What You Think sarisinfrastructure com electricbikepump...

Page 3: ...cap modules are provided with the system They bolt on to the ends of the ramp and pro vide a smooth transition on and off the Electric Bike Pump The Electric Bike Pump is attached to the stairs using...

Page 4: ...uded 3 8 drive ratchet Marker or Pencil SAE hex key set Level Tape Measure File or sanding tool Torque Wrench Parallel Wall or object Setbacks Figure 1 Setbacks Both sides of the electric public bike...

Page 5: ...we usually mount on the left side of the machine 2 Choose your mounting surface and fasteners If mounting to sheet metal we recommend using 14 sheet metal screws no longer than 3 4 If mounting into c...

Page 6: ...r pencil to outline the holes of the flange onto the base material We recommend checking the hole locations after each new anchor is placed Ensure the holes are at least 6 away from any cracks in the...

Page 7: ...he drill or by wrapping the bit with tape at the required depth We recommend a drill depth of 1 5 8 deep so that the anchor just sets down flush with the surface Figure 5 6 Before starting to drill th...

Page 8: ...y Figure 7 8 Next insert the drop in anchor with the open side up Drop the anchor into the hole Tap lightly to get the anchor flush with the base material 9 Now take the setting tool and insert it int...

Page 9: ...ite sides from each other You will thread the studs into the anchors prior to installing the nuts When tightening the special tamper resistant nuts always set and first tighten the anchors using stan...

Page 10: ...er connections You will make new connections at the terminal strip 4 It is important to use a strain relief on the incoming cable to avoid strain on the terminal strip connections Electrical Hook Up 1...

Page 11: ...nce issues arise please contact your local Approved Saris Infrastructure Distributor Required Maintenance Operation instructions for the pump are included on the faceplate of every pump via figure 9 d...

Page 12: ...12...

Page 13: ...13...

Page 14: ...14...

Page 15: ...15...

Page 16: ...16...

Reviews: