14 15
16 17
27
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Double Mount Installation
15) Use the M3/5-15x12 screws to attach each
display board to the housing.
NOTE:
For 2.5” Digit clocks, the holes for the
screws will be on the left and right inner surfaces of
the housing. For 4.0” Digit Clocks, the holes will be
on the top and bottom surfaces.
14) Attach the power wires to the port as
shown below.
24VAC/DC (Orange)
24VAC/DC (Yellow)
110/230VAC (Black)
110/230VAC (White)
1
2
3
4
5
Ground (Green)
16) Use the M3.5-1.5x12 screws to attach a display
board to each housing.
NOTE:
For 2.5” Digit clocks, the holes for the
screws will be on the left and right inner surfaces of
the housing. For 4.0” Digit Clocks, the holes will be
on the top and bottom surfaces.
17) Remove the plastic cover from each display board.