![Sanyo VHR-M261EV Service Manual Download Page 47](http://html.mh-extra.com/html/sanyo/vhr-m261ev/vhr-m261ev_service-manual_364515047.webp)
DECK MECHANISM DISASSEMBLY
4-3
(For Jog Shuttle Models)
Stator
Drum Motor
Rotor
(S2)
(S3)
(S2)
(S3)
(S1)
(S1)
Cap FPC
H1
(S1)
Drum Sub Assembly
Drum FPC
Optional Parts
Holder FPC
(only for 2HD MODEL)
1. Drum Assembly (Fig. A-1-1)
1) Unhook the (H1) on the back side of the Chassis and
separate the Cap FPC.
2) Remove three Screws (S1) and lift up the Drum
Assembly.
3) Remove two Screws (S2) and Separate the Stator of
Drum Motor.
4) Remove two Screws (S3) and Separate the Rotor of
Drum Motor from the Drum Sub Assembly.
(1) When reassembling Cap FPC, two Holes of Drum FPC
are inserted to the two Bosses of Holder FPC correctly.
(Refer to Fig. B-1)
Fig. A-1
NOTE
(Fig. A-1-1)
(Fig. A-1-1)
(Fig. B-1)
Holder FPC
Drum FPC
Cap FPC
Figure in the opposite direction