PDG-SU20
36
(4) Resolution
I/O port
SVGA
Test Equipment
PC
Test Method
1. Rotate Zoom ring to wide mode (Maximum projected image)
2. Fix projector to set diagonal length of projected image to 60”.
3. Adjust focus ring to make resolution of 4 corners and center
are balanced.
4. Check he characters should be recognized easily.
5. Rotate Zoom ring to tele mode (Minimum projected image)
6. Adjust focus ring to make resolution of 4 corners and center
are balanced.
7. Check the characters should be recognized easily.
(5) Front and Rear infrared sensor
Device
Front and Rear infrared
Test Equipment
Remote controller
Test method
1. Cover front sensor and operate remote controller to test rear
sensor
2. Cover rear sensor and operate remote controller to test front
sensor
(6) Brightness measurements
Test items
Brightness measurements
Test Equipment
Chroma automatic system (The alternative is CL-200)
Test method
Measure 9 points
Criteria
Marketing spec 20% off
Summary of Contents for PDG-DSU20B
Page 8: ...PDG SU20 4 1 3 System Block Diagram ...
Page 25: ...PDG SU20 21 Step Figure Description 15 Remove the foot stand ...
Page 28: ...PDG SU20 24 z Remove the screws M3x6x2 z Remove Color wheel module ...
Page 49: ...PDG SU20 45 6 1 Mechanical Drawing ...
Page 50: ...PDG SU20 46 6 2 Optical Parts Location ...
Page 51: ...PDG SU20 47 ...
Page 52: ...PDG SU20 48 ...
Page 57: ...PDG SU20 53 Appendix D More details for main board measurement 1 Signal of DAD2000 26V 26V ...
Page 58: ...PDG SU20 54 2 Ballast Feedback Signal ...
Page 59: ......
Page 60: ... KA7A Sep 2007 DC 350 Printed in Japan SANYO Electric Co Ltd ...