12
INSTALLATION
Installation
1. Remove the packaging materials and tapes
Remove all transportation packaging materials and
tapes. Open the doors and ventilate the unit. If
the outside panels are dirty, clean them with a
neutral detergent and wipe off with a soft cloth
washed in clean water.
2. Adjust the leveling feet
Extend the leveling feet by rotating them as shown
in the figure until they make contact with the floor.
Ensure the unit is level.
3. Fix the unit
Two fixtures are attached to the rear of the frame.
Fix the frame to the wall by attaching a rope or chain
between the wall and the fixtures.
If holes can be drilled in the wall, drill a 10.5mm
diameter hole and fix the unit by using the special
bolt-nut supplied. This bolt-nut can only be used on a
concrete wall.
4. Ground (earth)
WARNING
Use a power supply outlet with ground (earth)
to prevent electric shock. If the power supply outlet is
not grounded, it is necessary to install a ground by qualified engineers.
Never ground the unit through a gas pipe, water main, telephone line or lightning rod.
Such
grounding may cause electric shock in the case of an incomplete circuit.
Leveling foot
Bolt (provided)
45 mm
10.5 mm
(diameter)