ENGLISH
– ENGLISH – ENGLISH – ENGLISH – ENGLISH – ENGLISH – ENGLISH – ENGLISH
7/13
6. Place the bench
Put the bench into position on the supports fixed on left and right panel
PIC-8
7. Place the connection bar to the front panel
Place latch of front panel into connection bar, screw them tightly from the connection bar side
PIC-9.
8. Place front panel
Place right panel’s latch and left panel’s latch into the fixed connection bar, then screw the front panel
and the two sides panels tightly from the connection bar side
PIC-10
PIC-9
Install the connection bar and the front panel
PIC-10
Install front panel
9. Place the top panel
Make sure all the connection wires for heaters and digital devices go through the corresponding holes
of the top panel. Place the top panel properly and screw it tightly
PIC-11
10. Fix the decoration column to the connection bar
Put the decoration column into the right panel to front panel edge/left panel to front panel edge, place
them in position and make them looks same height and effect, then screw them inside the sauna
room from the connection bar
PIC-12
PIC-11 Place top panel
PIC-12 Place decoration column