background image

5

10

3

2

1

10

5

10

3

2

1

1

0

7

9

8

2

2

2

6

Please Note:

Baths should be set at supplied panel height.

The baseboard is encapsulated into the bath.

Half the panel clips supplied should be secured (if possible) to the floor

Before the final fixing of the bath, fit tap and waste fittings using a suitable 

sealing compound. When complete place the bath into position, re-check levels 

and make any final adjustments necessary. Finally secure the feet to the floor 

and the wall brackets to the wall. Movement may occur if not fitted correctly

HECK THAT THE BATH RIM IS LEVEL. 

2

4

2

4

2

4

5

10

10

2

2

3

5

10

10

2

2

3

7

9

8

2

2

Reviews: