INSTALLATION
PROCEDURE
2
.
Position the towel rail in desired location. Check for level and mark four equal positions for the
brackets.
Make sure the towel rail is installed vertically.
Before installation place a dust sheet on the floor to prevent losing any small parts.
!
Allow enough room for the installation of valves or thermostatic controls