background image

1

2

1 - Referring to the dimension shown in 

picture, embed the body into the wall, 

checking the alignment. Make the 

connections looking the scheme and 

check that there are no leaks.

IMPORTANT: leave the plastic 

protection mounted until the tiles are 

applied, which must be suitably cut in 

order to follow the measure of the 

protection.

2 - Remove the protections 

3 - Insert the plate 

4 - Insert the handles according to the 

drawing: press the cross handle and lock 

the mixer handle with the grub screw.

Reviews: