1
2
1 - Referring to the dimension shown in
picture, embed the body into the wall,
checking the alignment. Make the
connections looking the scheme and
check that there are no leaks.
IMPORTANT: leave the plastic
protection mounted until the tiles are
applied, which must be suitably cut in
order to follow the measure of the
protection.
2 - Remove the protections
3 - Insert the plate
4 - Insert the handles according to the
drawing: press the cross handle and lock
the mixer handle with the grub screw.