5
3b
3
X=7-14 mm
X=14-27 mm
4
Assemble the parts as per the above.
Ensure that the mains water supply is
off before installation.
Install the parts to be concealed
respecting the dimensions indicated in
point (1); be careful to put them aligned.
Connect the hot and cold water
supplies to the valves and make a
pressure test to check for leaks at
the connections*.
Once the surrounding finishes have
been applied (tiles/marble etc.) remove
the front covers and the test cap (2).
Proceed with the preparation and
installation of the external parts
following the procedures indicated in
points 2 (2a or 2b depends on the
concealing depth of the bodies), 3 (3a or
3b depends on the concealing depth of
the bodies) and 4.
Install spout and handles according to
the instructions at point 5.Open the
water supplies and check that there are
no leaks.
*Before making any inlet pipe
connection, all supply pipes MUST be
thoroughly flushed to remove debris.
Failure to do this could result in
damage to the valves and components
or low flow.