S&C 6802 Application Manual Download Page 5

  

S&C Instruction Sheet 1045-568

  

5

Overhead Source-Transfer Software

Use these instructions with software 

SG6802DOInstaller-3.5.5 

or a later  

revision .

Step 1

Install 

SG6802DOInstaller-3.5.5

 software on the computer that will be used to program 

the 6802 Controls . IntelliLink

®

 Software will be automatically installed .

Step 2

Connect your computer to the switch control with a serial or USB cable . Always use 
battery power or a grounded, 3-wire extension cord for your computer and the ac  
powered switch control . Your serial or USB port may be damaged if the computer or 
switch control is not grounded .

Step 3

Start IntelliLink with 

Start > Programs > S&C Electric > IntelliLink

 . IntelliLink will 

automatically connect to the 6802 Control and open the 

Operation

 screen .

Step 4

On the 

Setup > General > Time

 screen, configure the parameters for 

Daylight  

Savings Time Automatic Switchover

Time and Date

 . On the 

Setup > General

  

screen configure the 

Physical Location

 and 

Cabinet Heater

 settings . Ignore the  

Cabinet Heater

 setting if the control is not powered from a 120-Vac source, because the 

heater does not function with sensor power . Enter the serial number for each switch .

Step 5

On the 

Setup > General > Sensor Configuration 

screen enable 

Visual Disconnect 

status for Scada-Mate installations . Scada-Mate CX Switches do not have a status  
contact for their optional visual disconnect . Enter the sensor calibration data provided for 
Switch 1 and Switch 2 . Switch 1 is connected to the rear FIC near the mounting bracket, 
Switch 2 is connected to the front FIC near the enclosure door .

Step 6

On the 

Setup > General > Site-Related

 screen enter the installation-dependent  

parameters for voltage . The 

Loss-of-Voltage Threshold

 setting can be increased as  

reliability and power quality dictate for a particular load . Please review the 

Setup  

Instructions

 . Instantaneous reclose of an upstream breaker or recloser must be consid-

ered when determining the LOV setting . A voltage loss less than 15 cycles may not be 
detected by a 6802 Control . To detect a 15-cycle voltage loss at the 6802 Control, do not 
set the 

Loss-of-Voltage Threshold

 any lower than 60 volts .

  For a phase-to-neutral connected transformer, the 

Phase Angle Offsets

 should be set 

to zero degrees . For phase-to-neutral transformers, the 

Phase Angle Offsets 

should be 

set to 30 or 330 degrees . Verify that the 

Real-Time Data

 is correct . The correct settings 

will result in current in the normal direction and a reasonable power factor . See the  

Setup Instructions

 for further details .

Step 7

On the 

Setup > General > Fault Detection

 screen select phase and ground fault  

settings according to the time-current clearing curves of the upstream fault-clearing 
device . Instruction Sheet 1042-572 

Setting Phase and Ground Overcurrent Levels

 can 

assist you in determining these settings . For most installations, the 

Phase Fault Detection 

Current Level

 should be set at 90% of the minimum trip setting of the upstream recloser 

or breaker, and the 

Fault Duration Time Threshold

 should be set according to the  

fastest clearing time for high-magnitude faults . 

Ground Fault

 protection should be set 

to coordinate with the time-current curve of the upstream fault-clearing device . The 
usual setting is 100% of minimum to trip . Inrush settings should consider the connected  
transformer and motor kVA on the load side of the switch, and follow ANSI/IEEE  
guidelines .

Summary of Contents for 6802

Page 1: ...le of Contents Section Page Section Page Introduction Qualified Persons 2 Read this Instruction Sheet 2 Retain this Instruction Sheet 2 Warranty 2 Safety Information Understanding Safety Alert Message...

Page 2: ...ction Sheet This instruction sheet is a permanent part of your S C Model 6802 Automatic Switch Control Designate a location where you can easily retrieve and refer to this publication Warranty The sta...

Page 3: ...ons are not followed NOTICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If you d...

Page 4: ...Operating Instructions and the Setting Phase and Ground Overcurrent Levels Instruction Sheet 1045 530 available at the S C Website sandc com Familiarize yourself with the features procedures warnings...

Page 5: ...eneral Site Related screen enter the installation dependent parameters for voltage The Loss of Voltage Threshold setting can be increased as reliability and power quality dictate for a particular load...

Page 6: ...toration IntelliTEAM SG Team 1 Setup screen See Figure 2 Enter a Team ID and set Team Logic to IT II Adjust the Return to Normal Timer if you want to use that function Overhead Source Transfer Softwar...

Page 7: ...et it back to Running and click OK Step 14 Wait for the control to go into the Ready mode by watching the LCD on the control Step 15 Save a snapshot of the control data The Save Snapshot command is in...

Page 8: ...Printed in U S A...

Reviews: