16_
setting up your new washing machine
STEP 2
Removing the shipping bolts
Before installing the washing machine, you must remove the five shipping bolts from the back of
the unit.
1.
Loosen all the bolts with the supplied wrench.
2.
Hold the bolt with the spanner and pull it through the wide
section of the hole. Repeat for each bolt.
3.
Fill the holes with the supplied plastic covers.
4.
Store the shipping bolts away safely in case you have to move the washing machine in the
future.
Packaging materials can be dangerous to children; keep all packaging material (plastic
bags, polystyrene, etc.) well out of the reach of children.
Insert the cap fixer, (one of the accessories
in the vinyl pack), into the hole from which
you removed the power cord at the back
of the product.
setting up your washing
machine
WARNING
WF9602SQR-02776D-02_EN.indd 16
2010-11-2 15:50:54
Summary of Contents for WF9604GQ
Page 38: ...memo WF9602SQR 02776D 02_EN indd 38 2010 11 2 15 51 22...
Page 39: ...memo WF9602SQR 02776D 02_EN indd 39 2010 11 2 15 51 22...
Page 78: ...pozn mky WF9602SQR 02776D 02_CS indd 38 2010 11 2 15 29 35...
Page 79: ...pozn mky WF9602SQR 02776D 02_CS indd 39 2010 11 2 15 29 35...
Page 118: ...jegyzet WF9602SQR 02776D 02_HU indd 38 2010 11 2 15 46 40...
Page 119: ...jegyzet WF9602SQR 02776D 02_HU indd 39 2010 11 2 15 46 40...
Page 158: ...notatki WF9602SQR 02776D 02_PL indd 38 2010 11 2 15 48 19...
Page 159: ...notatki WF9602SQR 02776D 02_PL indd 39 2010 11 2 15 48 19...
Page 198: ...pozn mky WF9602SQR 02776D 02_SK indd 38 2010 11 2 15 49 52...
Page 199: ...pozn mky WF9602SQR 02776D 02_SK indd 39 2010 11 2 15 49 53...