![Samsung UE48JU7500T Service Manual Download Page 76](http://html.mh-extra.com/html/samsung/ue48ju7500t/ue48ju7500t_service-manual_357630076.webp)
3-2
3. Disassembly and Reassemble
Description
Picture Description
Screws
3
Remove the screws of ASSY COVER
P-REAR.
48": 15 EA
•
55": 17 EA
•
Torque :
7~ 8Kgf.cm.
6001-002755
In this step, two types of screws are
used.
65": 21 EA / 1 EA
•
78": 22 EA / 1 EA
•
Torque :
9~ 10Kgf.cm.
6003-000003
4
Remove the ASSY COVER P-REAR.
5
Remove the Electric tapes shown on the
image.
EMI Point
•
: After removing release
paper from the LVDS Cable bottom,
attach the LVDS Cable to the C/
Chassis and rub the attatched
surface.
CAUTION
When assembling the TV, the electric
tapes must be applied on the same
locations.
Please remember to take a picture of
where the tapes were first applied.
Filament Tape: EMI Point
Filament Tape: Dressing Point
Cable Dressing