CHAPTER 2. Pre-Installation Requirements
2-2
© SAMSUNG Electronics Co., Ltd.
Environment
When preparing the installation site, you need to allow sufficient clearance
around the rack.
For the cooling system to function properly, the airflow around the chassis
must be unrestricted.
For a service personnel to remove and install hardware components, there
must be adequate space at the front and back of the router.
Allow at least 30-inch (76.2 cm) both in front of and behind the router.
Figure 2.1 Top view of the cooling air path through the chassis