E
15
1-4. Basic System Installation
Perform the following steps to install your system.
●
Take the monitor out of the packaging box.
●
Place the monitor where you would like to install it. Do not turn on power until
installation is complete
●
Choose the place where you want to install the camera.
●
Once the monitor and camera locations have been chosen, install the camera.
●
Connect the cable to the jack on the back of the camera.
●
Connect the other end to CAMERA IN on the back of the monitor.
(At this time, select the numbers and sequence of cameras.)
●
Connect the camera you wish to install (as shown below).
●
Connect the power cord between the monitor and the power outlet.
●
When the Power switch on the front panel of the monitor is pressed, the equipment
becomes operational.
(Initially quad screen will be displayed.)
✳
After the power has been turned on, the CRT needs approximately 20 seconds of
stabilization period.
Summary of Contents for SOD-14C4LN
Page 2: ...COLOR QUAD OBSERVATION SYSTEM Installation Manual SOD14C4LN E F ES ...
Page 36: ...MEMO ...
Page 70: ...MEMO ...
Page 104: ...MEMO ...