Confidential and proprietary-the contents in this service guide subject to change without prior notice
Distribution, transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.
7. Level 2 Repair
7-5. Assembly
※
Caution
Be care of FPCB, components damage and tilt.
※
Caution
Be care of press power/time.
※
Caution
1) Be care of scratch and REAR damage.
2) Check for contact damage.(red area).
※
Caution
Be care of chip damage nearby screw point.
3
Assemble Main PBA and Sub PBA to Front case
1
Attach components on Front.
(RCV module, Motor, Battery)
2
Attach Main CAM on PBA.
Screw 3 points in SUB PBA (Torque :
1.4 Kgf·cm)
4