. General installation Guide
. General installation Guide
20
20
(2) Conveying the outdoor unit
(2) Conveying the outdoor unit
Picture
Picture
Work
Work Description
Description
Things
Things to
to do
do
Check
Check point
point
Checking the
Checking the
outdoor unit.
outdoor unit.
A group of four move
A group of four move
the outdoor unit(22HP)
the outdoor unit(22HP)
Check for damages in the
Check for damages in the
outdoor unit.
outdoor unit.
(3) Mounting the vibration-proof board
(3) Mounting the vibration-proof board
Picture
Picture
Work
Work Description
Description
Things
Things to
to do
do
Check
Check point
point
Mounting the
Mounting the
vibration-proof
vibration-proof
board.
board.
Install it in the upper
Install it in the upper
area.
area.
- Do not change the
- Do not change the
location of the vibration-
location of the vibration-
proof board.
proof board.
- Check the location in the
- Check the location in the
diagram once again.
diagram once again.
(4) Connecting the vibration-proof board
(4) Connecting the vibration-proof board
Picture
Picture
Work
Work Description
Description
Things
Things to
to do
do
Check
Check point
point
Connect the
Connect the
outdoor unit to the
outdoor unit to the
vibration-proof
vibration-proof
board.
board.
Bolting of the vibration-
Bolting of the vibration-
proof board.
proof board.
Check bolt installation and
Check bolt installation and
the final levelness.
the final levelness.
(5) Completed installation of outdoor units
(5) Completed installation of outdoor units
Picture
Picture
Work
Work Description
Description
Things
Things to
to do
do
Check
Check point
point
Completed
Completed
installation
installation
Reinforce the outdoor
Reinforce the outdoor
unit.
unit.
Check for reinforcement.
Check for reinforcement.