2) Piping works among outdoor units
2) Piping works among outdoor units
The additional branch joints are needed for module installation of the outdoor units.
The additional branch joints are needed for module installation of the outdoor units.
When outdoor units are installed
When outdoor units are installed in module, there is no designation of outdoor unit’s location
in module, there is no designation of outdoor unit’s location
according to capacity.
according to capacity.
The connected piping should be positioned at the same or lower level with pipe cover hole.
The connected piping should be positioned at the same or lower level with pipe cover hole.
Cautions
Cautions
Correct
Correct piping
piping work
work
Wrong piping work
Wrong piping work
The refrigerant
The refrigerant
piping
piping should
should be
be
the same level or
the same level or
lower than
lower than
connecting position
connecting position
of piping to
of piping to outdoor
outdoor
units.
units.
Piping work should
Piping work should
be run with side
be run with side
direction for better
direction for better
uniform distribution
uniform distribution
of refrigerant and oil
of refrigerant and oil
like next diagram.
like next diagram.
Outdoor joint kits
Outdoor joint kits
should be installed
should be installed
in a horizontal
in a horizontal
direction even it is a
direction even it is a
low pressure pipe.
low pressure pipe.
When the piping
When the piping
length between
length between
outdoor and branch
outdoor and branch
joints is 2m or
joints is 2m or
more, a vertical trap
more, a vertical trap
has to be installed
has to be installed
like right diagram.
like right diagram.
Summary of Contents for MXJ-HA2512 Series
Page 1: ......
Page 137: ...136 136 Installation guide Installation guide ...