LED R&D Lab(VD)
46
⑭
When the ASSY BRACKET P-
FRONT installation is complete, fix it with the BRACKET SUPPORT on the left and right sides
.
-
BRACKET-SUPPORT assembly position is generally assembled with top/bottom center 3POINT. (Addable depending on the situation)
- After assembling the SCREW-SPECIAL into the BRACKET-SUPPORT, turn it and push the inside.
Fig.1 BRACKET
-SUPPORT INSTALL
BRACKET-
SUPPORT LEFT RIGHT
SCREW SPECIAL
SCREW MACHINE
4. FRAME installation and cable connection