SAMSUNG Proprietary-Contents may change without notice
Exploded View and Parts List
11-4
This Document can not be used without Samsung's authorization
1
2
3
4
1) Attach the Key Pad into SLIDE UPPER.
.Threre is two guide holes.
1) Attach the sub domesheet on SUB PCB
of the LCD MODULE.
- There is two guide holes.
1) Insert the slide F-PCB and camera F-PCB.
1) Attach isolate tape as marked.
1) Please not to be damaged components of SUB
PBA and not to scratch the slide upper/ SUB PBA
when assembling.
1) Please not to be damaged components of LCD
2) Careful not to scratch SLIDE UPPER/ SUB PBA.
3) LCD is inserted correct as marked
1) Be careful not to be damaged and scratched.
2) Handle with care the F-PCB not to be torn or
damaged.
1) Be careful not to be damaged and scratched.
2) Handle with care the F-PCB not to be torn or
damaged.
①
②
11-2. Assembly
Summary of Contents for GT-S5200
Page 89: ...www s manuals com ...