SAMSUNG Proprietary-Contents may change without notice
7. Level 2 Repair
7-4
This Document can not be used without Samsung's authorization
1) Adjust the PBA to 2 POINT on Front Ass'y.
1) Push the connector with sound '??' to avoid
incompletion of insert.
SCREW Torque: 1.1 ~ 1.3kgf.cm
1) Be careful of appearance faulty
※ M1.4 X L4.0
SCREW Torque: 1.2 ~ 1.4kgf.cm
5
Put PBA on Front Ass'y.
6
Connect LCD and Touch key FPCB on PBA and
tighten screws.
7
Attach Rear cover on set and tighten screws.
Summary of Contents for GT-I9023 (Owner''''s Guide)
Page 92: ...www s manuals com ...