SAMSUNG Proprietary-Contents may change without notice
Exploded View and Parts List
11-5
This Document can not be used without Samsung's authorization
11-2 Assembly
4
1) Attach the TSP to the Upper.
2) Place navi on Upper.
1) Attach the LCD assy to the Upper.
2) Put in the TSP FPCB to the connector.
Be careful of FPCB demage.
3) Put TAPE on Upper,
1) Put in the camera , Receiver FPCB to each
connector by using the pincette.
1) Assemble upper assy with lower.
1
2
3