Drawing of complete installation
Make sure of using the gas as specified
on the nameplate. (LN gas)
The gas connection work should be
carried out by a qualified gas supply
agency or gas piping facility agency.
After completing pipe connection, you
must apply a gas leakage test. Use
product ofter you make sure of no gas
leakage.
Assemble product into the countertop.
Place burner head onto corresponding
burner body according to burner location
correctly. Make sure that the burner head
is not lifted up nor tilted.
If burner head is not correctly assembled,
ignition may fail.