
3-5
3. Disassembly and Reassemble
Description & Screws
Picture Description
10
Remove the DC VSS-PD BOARD.
1.
You have to discharge the SMPS by using
Discharge JIG across leads of Large Capacitors
as pictured side.
Service Jig-Capacitor Discharge
• If
LED ON
£
LED OFF
discharge is
completed.
BN81-16292A
<Before discharging>
<After discharging>
LED ON
LED OFF
• 43 inches
Measurement point
Measurement point
• 50 inches
Measurement point
Measurement point
• 55/65 inches
Measurement point
Measurement point