Disassembly and Reassembly
Samsung Electronics
1-51
1-4-32 Assembly of Gear Loading “L”, “R” Ass’y
1. When reinstalling, be sure to align 2 arrow as shown in Fig. 1-52. (Refer to timing point)
ALIGN TWO ARROWS
GEAR - LOADING
" R" ASSEMBLY
GEAR - LOADING
" L" ASSEMBLY
TIMING POINT
Fig. 1-52 Assembly of Gear Loading “L”, “R” Ass’y