VCR Deck Operating Description
8-6
Samsung Electronics
8-4-3 Tape Loading
A full loading system is employed.
In the full loading system, the tape loading starts at the same time when the cassette loading operation has com-
pleted and cassette has been mounted, and the tape is pulled out, wrapped around the cylinder and the mecha-
nism enters the stop status under this condition.
Fig. 8-8 Tape Loading
Cylinder
T guide roller
ACE head
Tape guide
Pinch roller
No. 9 guide
No. 8 guide
Capstan
Guide post
Guide post
S guide roller
FE head
Tension post
Tape guide
8-4-4 Playback Standby Mode
In the full loading system, the tape loading starts at the same time when the cassette mounting has completed, the
mechanism shifts to the playback position, and enters the standby status with keeping tape wrapped around the
cylinder.
In this case, tape tension applied to the cylinder is decreased to protect the tape and to prevent the tape from
scratches.