English
27
Installation checklist
• The dryer is plugged into a properly grounded outlet.
• All packaging material is completely removed and properly disposed.
• The dryer is level and standing firmly on the floor.
• Start the dryer to make sure that it runs, heats, and shuts off.
•
Run a
TIME DRY
cycle for 20 minutes to see if the
HC
information code is
displayed. If this is the case, contact a local service centre.
• After installation, we recommend that you wait at least 1 hour before using the
dryer.
Before using the dryer
• Make sure no accessory remains inside the drum.
• Plug in the power cord just before operating the dryer.
• Do not block the air inlet hole of the cooling grill at the front of the dryer.
• Do not place inflammable objects near the dryer and keep the surroundings clean.
• Keep the dryer level with the ground.
• Do not remove the adjustable levelling legs of the dryer. They are necessary to
keep the dryer level with the ground.
Installation
DV5000T_DC68-04209X-00_EN - .indd 27
2021/4/5 9:21:47