11
eng
English
●
COnneCtiOnS
connections
inStaLLing tHe tOrOiDaL ferrite On tHe POWer CaBLe
Wind Power cable around the core three times.
(Start winding at 5-10cm away from the plugs)
Close the lock back.
Lift up to release the lock and open the core.