Drainpipe and drain hose installation
Testing the drainage
You should test the drainage after completing the installation.
Prepare a little water about 2.0 liters.
1
Turn the cover drain pump, then pull it out.
2
Pour water into the indoor unit as shown in figure.
Note
If you do not pour water inside the water supply intake, water
may spill from the indoor unit.
3
Confirm that the water flows out through the drain hose.
Note
You can check the drainage only when the air conditioner is in
cool mode.
4
Reassemble the cover drain pump.
Note
If a concentrated drain hose is installed, refer to the figure below.
Concentrated drain hose