
33
English
Ins
tallation
<Possible directions of the pipe bundle>
Left
Right
Rear right or left
Bottom right
CAUTION
•
If changing the pipe direction from left to right, do not
drastically bent it but slowly turn it in the opposite
direction as shown. Otherwise, the pipe may be
damaged in the process.
(Unit : mm)
Model
A
B
C
D
18/24
52
144
69
50
18
49
51
77
49
24
52
51
79
52
09/12/18
Pipe bundle hole : Ø 65mm
24
Pipe bundle hole : Ø 90mm
<Minimum distances between the hole and
the installation plate>
2
Drill the hole.
CAUTION
•
Be sure to drill only one hole.
•
Make sure that the hole slants downwards so that the
drain hose slants downwards to drain water well.
Wall
Drain hose
Indoor unit
<The hole slants downwards>
Step 1.4 Taping the pipes, cables, and
drain hose
1
Wrap foam insulation on parts without insulation on
the ends of the refrigerant pipes, as shown in the
figure. This wrapping minimises condensation problem.
Insulation
Refrigerant pipes
2
Wind the refrigerant pipes, power cable,
communication cable and drain hose with vinyl tape to
make a pipe bundle.
Refrigerant pipes
(assembly pipe)
Installation plate
Vinyl tape
Power and communication cables
(assembly cable)
Drain hose
RAC MEDIA ODM 아프리카향 IBIM_EN_DB68-00000A-00.indb 33
2017-01-20 오전 11:28:40