
E-
11
ENGLISH
Cutting or Extending the Pipe
A 5-meter pipe is supplied with the air conditioner. (optional)
The length of the pipe can be:
Extended up to 15(
09/12
)/30(
18/24
) meters
Shortened as required
If you need a pipe longer than 5 meters:
You must extend the assembly cable.
1
Make sure that you have the required tools (pipe cutter, reamer, flaring tool
and pipe holder.)
2
If you want to shorten the pipe, cut it using a pipe cutter, ensuring that the cut
edge remains at 90° with the side of the pipe (see examples of correctly and
incorrectly cut edges below.)
Oblique
Rough
Burr
3
To prevent a gas leak, remove all burrs at the cut edge of the pipe using a
reamer.
4
Put a flare nut slightly into the pipe and modify the flare.
Outer Diameter (D)
Depth (A)
6.35 mm
1.3 mm
9.52 mm
1.8 mm
12.70 mm
2.0 mm
15.88 mm
2.2 mm
19.05 mm
2.2 mm
22.23 mm
2.2 mm
5
Check if you flared the pipe correctly (see examples of incorrectly flared pipes
below.)
Inclined
Damaged Surface
Cracked
Uneven Thickness
6
Align the pipes to connect them easily. Tighten the flare nuts first with your
hands, and then with a torque wrench, applying the following torque:
Outer Diameter
Torque (kgf•cm)
6.35 mm
140~170
9.52 mm
250~280
12.70 mm
380~420
15.88 mm
440~480
19.05 mm
990~1210
22.23 mm
990~1210
In case welding the pipe, the gas nitrogen must be blown into the parts.
7
For further details on how to connect to the outdoor unit and purge the air,
refer to page 15.
I
NSTALLING
THE
A
IR
CONDTIONER
08'FORTE_VIVACE_Inv_IM_28492A£¨4£©_E.indd 11
2007-12-6 9:32:50