![Samsung AJ RBLDEG Series Installation Manual Download Page 19](http://html.mh-extra.com/html/samsung/aj-rbldeg-series/aj-rbldeg-series_installation-manual_1187892019.webp)
19
Ins
tallation Pr
oc
edur
e
English
Method 1
Connection sleeve
Connection sleeve
Method 2
4
Using a crimping tool, compress the two points and flip it
over and compress another two points in the same location.
• The compression dimension should be 8.0.
Compression
dimension
• After compressing it, pull both sides of the wire to
make sure it is firmly pressed.
5 mm
5 mm
Method 1
Method 2
Compress it 4 times.
Compress it 4 times.
5
Wrap it with the insulation tape twice or more and
position your contraction tube in the middle of the
insulation tape.
A total of three or more layers of insulation is required.
40 mm
35 mm
Method 1
Method 2
Insulation tape
Insulation tape
6
Apply heat to the contraction tube to contract it.
Contraction tube
7
After tube contraction work is completed, wrap it with
the insulation tape to finish.
Insulation tape
CAUTION
• Make sure that the connection parts are not exposed
to outside.
• Be sure to use insulation tape and a contraction tube
made of approved reinforced insulating materials that
have the same level of withstand voltage with the
power cable. (Comply with the local regulations on
extensions.)
WARNING
• In case of extending the electric wire, please DO NOT
use a round-shaped Pressing socket.
– Incomplete wire connections can cause electric shock
or a fire.
Step 14 Increasing Fan Speed
If external static pressure is too great(due to long
extension of ducts, for example), the air flow volume
may drop too low at each air outlet. This problem can be
solved by increasing the fan speed using the following
procedure.
1
Remove the screw on the electrical component box and
remove the cover plate.
2
Adjust the DIP switch(SW05) on the main PCB to the
“OFF” position.
K1 K2 K3 K4
SW05
Switch No.
Switch Position
Function
K3
ON
Normal speed
OFF
High speed
3
Re-install the cover plate and join the removed screw.