
2
English
Contents
Power supply line, fuse or circuit breaker
Step 1 Choosing the installation location
Step 2 Fixing the outdoor unit in place
Step 3 Connecting the power cables, communication cable, and controllers
Step 4 Optional: Extending the power cable
Step 5 Connecting the refrigerant pipe
Step 6 Optional: Cutting and flaring the pipes
Step 8 Connecting up and removing air in the circuit
Step 9 Adding refrigerant (R-32)
Step 10 Performing the gas leak test
Step 11 Connecting the drain hose to the outdoor unit
Step 12 Insulating the refrigerant pipes
Step 14 Performing final check and trial operation
Relocating the indoor and outdoor units
CAC_R32_AU_Outdoor IM_EN_DB68-08522A-00_.indd 2
2019-08-19 오전 10:10:56