2
English
Contents
Step 1 Checking and preparing accessories
Step 2 Choosing the installation location
Step 3 Optional: Insulating the body of the indoor unit
Step 4 Installing the indoor unit
Step 5 Purging inert gas from the indoor unit
Step 6 Cutting and flaring the pipes
Step 7 Connecting the assembly pipes to the refrigerant pipes
Step 8 Performing the gas leak test
Step 9 Insulating the refrigerant pipes
Step 10 Installing the drain hose and drain pipe
Step 11 Performing the drainage test
Step 12 Optional: For the installation of the circular panel
Step 13 Connecting the power and communication cables
Step 14 Optional: Extending the power cable
Step 15 Setting the indoor unit addresses and the installation options
CAC_R32_호주향 360 IM_EN_DB68-08492A-01.indb 2
2019-08-27 오후 3:49:06