2
English
Contents
Safety Information
3
Safety Information
3
Installation Procedure
5
Step 1 Checking and preparing accessories
5
Step 2 Choosing the installation location
5
Step 3 Optional: Insulating the body of the indoor unit
7
Step 4 Installing the indoor unit
8
Step 5 Purging inert gas from the indoor unit
9
Step 6 Cutting and flaring the pipes
9
Step 7 Connecting the assembly pipes to the refrigerant pipes
10
Step 8 Performing the gas leak test
11
Step 9 Insulating the refrigerant pipes
11
Step 10 Installing the drain hose and drain pipe
12
Step 11 Performing the drainage test
14
Step 12 Optional: Installing DPM
15
Step 13 Connecting the power and communication cables
15
Step 14 Optional: Extending the power cable
16
Step 15 Setting the indoor unit addresses and the installation options
18
Appendix 30
Troubleshooting 30
CAC R-32_Mini 4way_IM_DB68-08129A-00_EN_20181218.indd 2
2018/12/18 17:24:51