
AA
30
English
5. Wrap it with the insulation tape twice or more and position your contraction tube in the middle of the
insulation tape.
Three or more layers of insulation are required.
f
Method 1
40 mm
Insulation tape
f
Method 2
Insulation tape
35 mm
6. Apply heat to the contraction tube to contract it.
Contraction tube
7.
After tube contraction work is completed, wrap it with the insulation tape to finish.
CAUTION
• Make sure that the connection parts are not exposed to outside.
• Be sure to use insulation tape and a contraction tube made of approved reinforced insulating
materials that have the same level of withstand voltage with the power cable. (Comply with the
local regulations on extensions.)
Insulation tape
WARNING
• In case of extending the electric wire, please DO NOT use a round-shaped Pressing socket.
- Incomplete wire connections can cause electric shock or a fire.
Extending the power cable
Summary of Contents for AC NN4SEC Series
Page 39: ...ENGLISH 39 English ...