Pump down Procedure
Pump down will be carried out when an evaporator is replaced or when the unit
is relocated in another area .
1 .
Remove the cap from the low pressure side.
2 .
Turn the low pressure side valve clockwise to close and connect a pressure
gauge (low pressure side) to the service valve, and open the valve again.
3 .
Set the unit to the cooling Test mode by pushing K2 button (Check if the
compressor is operating.)
4 .
Turn the high pressure side valve counter clockwise to close.
5 .
When the pressure gauge indicates “0” turn the low pressure side valve
counter clockwise to close.
6 .
Stop operation of the air conditioner by pushing K3 button.
7 .
Close the each cap of valve.
B(liquid)
A(gas)
Relocation of the air conditioner
• Refer to this procedure when the unit is relocated .
• Carry out the pump down procedure (refer to the details of ‘pump down’) .
• Remove the power cord .
• Disconnect the assembly cable from the indoor and outdoor units .
• Remove the flare nut connecting the indoor unit and the pipe .
• At this time, cover the pipe of the indoor unit and the other pipe using a cap or vinyl plug to avoid foreign
material entering .
• Disconnect the pipe connected to the outdoor unit . At this time, cover the valve of the outdoor unit and the
other pipe using a cap or vinyl plug to avoid foreign material entering .
• Make sure you do not bend the connection pipes in the middle and store together with the cables .
• Move the indoor and outdoor units to a new location .
• Remove the mounting plate for the indoor unit and move it to a new location .