3 Disassembly and Reassembly
3-2
GH19B*
CONFIDENTIAL
4. Put the jig into the gap (between the right side
of the panel the and Front Cover) and tilt up
Front Cover until the snap opens.
5. Put the jig into the gap (between the right side
of the panel the and Front Cover) and tilt up
Front Cover until the snap opens.
6. After pushing the right bottom of the panel
with jig.
7. Pull up the Rear Cover until it opens fully.
3-2 Reassembly
Reassembly procedures are in the reverse order of Disassembly procedures.
Summary of Contents for 191T - SyncMaster 19" LCD Monitor
Page 11: ...Memo 2 Product Specifications 2 8 GH19B CONFIDENTIAL...
Page 17: ...4 Troubleshooting 4 4 GH19B CONFIDENTIAL 4 5 6 7 8 9 10 11 12 13 14 15...
Page 19: ...Memo 4 Troubleshooting 4 6 GH19B CONFIDENTIAL...
Page 20: ...CONFIDENTIAL GH19B 5 1 5 Exploded View and Parts List...
Page 21: ...CONFIDENTIAL 5 Exploded View Parts List 5 2 GH19B Memo...
Page 30: ...7 Block Diagram GH19B 7 1 CONFIDENTIAL...
Page 31: ...CONFIDENTIAL 7 Block Diagrams 7 2 GH19B Memo...
Page 33: ...CONFIDENTIAL 8 Wiring Diagram 8 2 GH19B Memo...
Page 35: ...9 Schematic Diagrams 9 2 GH19B 12 13 14 15 CONFIDENTIAL...
Page 37: ...CONFIDENTIAL 9 Schematic Diagrams 9 4 GH19B 10 11...
Page 39: ...CONFIDENTIAL 9 Schematic Diagrams 9 6 GH19B 1 2 3 4 6 7 8 9 5...
Page 41: ...CONFIDENTIAL 9 Schematic Diagrams 9 8 GH19B Memo...