EB 3131-1 EN
17
Measures for preparation
4 Measures for preparation
After receiving the shipment, proceed as fol-
lows:
1. Check the scope of delivery. Compare
the shipment received with the delivery
note.
2. Check the shipment for transportation
damage. Report any damage to
SAMSON and the forwarding agent
(refer to delivery note).
4.1 Unpacking
Do not remove the packaging until immedi-
ately before installing the valve into the pipe
-
line.
4.2 Transporting and lifting
Due to the low service weight, lifting equip-
ment is not required to lift and transport the
regulator (e.g. to install it into the pipeline).
Transport instructions
−
Protect the device against external influ
-
ences (e.g. impact).
−
Do not damage the corrosion protection
(paint, surface coatings). Repair any
damage immediately.
−
Protect the device against moisture and
dirt.
−
Observe the permissible ambient tem-
peratures (see section 3.1).
4.3 Storage
Risk of regulator damage due to improper
storage.
−
Observe the storage instructions.
−
Avoid long storage times.
−
Contact SAMSON in case of different stor-
age conditions or longer storage times.
We recommend regularly checking the de-
vice and the prevailing storage conditions
during long storage periods.
Storage instructions
−
Protect the device against external influ
-
ences (e.g. impact).
−
Do not damage the corrosion protection
(paint, surface coatings). Repair any
damage immediately.
−
Protect the device against moisture and
dirt. Store it at a relative humidity of less
than 75 %. In damp spaces, prevent con
-
densation. If necessary, use a drying
agent or heating.
−
Make sure that the ambient air is free of
acids or other corrosive media.
−
Observe the permissible ambient tem-
peratures (see section 3.1).
−
Do not place any objects on the device.
Note
NOTICE
!
Note
Summary of Contents for 46-7
Page 35: ...EB 3131 1 EN 35...