![Samson 45-6 Mounting And Operating Instructions Download Page 43](http://html1.mh-extra.com/html/samson/45-6/45-6_mounting-and-operating-instructions_3967653043.webp)
EB 3226 EN
9-5
Servicing
9.1 Preparing the valve for
service work
1. Lay out the necessary material and tools
to have them ready for the service work.
2. Put the regulator out of operation (see
the 'Decommissioning' section).
We recommend removing the regulator from
the pipeline before performing any service
work (see the 'Removing the regulator from
the pipeline' section).
The following service work can be per-
formed after preparation is completed:
−
Replacing the seat and plug (see sec-
−
Replacing the operating diaphragm (see
section 9.3.2)
−
Replacing the set point springs (see sec-
Tip
9.2 Installing the regulator
after service work
Î
Put the regulator back into operation (see
the 'Start-up' section). Make sure the re-
quirements and conditions for start-up or
putting the valve back into operation are
met.
9.3 Service work
Î
Before performing any service work,
preparations must be made to the regu-
lator (see section 9.1).
Î
After all service work is completed, check
the regulator before start-up (see the
'Testing the regulator' section).
Summary of Contents for 45-6
Page 14: ...2 2 EB 3226 EN Markings on the device...
Page 38: ...8 4 EB 3226 EN...
Page 50: ...9 12 EB 3226 EN Servicing...
Page 54: ...11 2 EB 3226 EN...
Page 56: ...12 2 EB 3226 EN...
Page 58: ...13 2 EB 3226 EN...
Page 62: ...14 4 EB 3226 EN...
Page 68: ...15 6 EB 3226 EN Annex...
Page 69: ......
Page 70: ......
Page 71: ......